MODELLING OF TIME, COST AND RISK OF CONSTRUCTION WITH USING FUZZY LOGIC

Author:

Plebankiewicz Edyta1ORCID,Zima Krzysztof1ORCID,Wieczorek Damian1ORCID

Affiliation:

1. Faculty of Civil Engineering, Cracow University of Technology, Cracow, Poland

Abstract

The paper presents an overview of the literature from recent years devoted to planning the time, costs and risk of a construction investment using fuzzy logic. It also presents three own original models concerning the issue. The first model is used to build a fuzzy construction schedule taking into account fuzzy norms and the number of workers. The costing model uses fuzzy inference from CBR cases. The aim was to increase the accuracy and correctness of the cost calculation performed for the investor in the construction and investment process with a certain degree of vagueness of the available information about materials. In the last of the presented models, fuzzy sets were used to assess the effects of technological and construction (implementation) risk factors. The presented examples prove the usefulness of fuzzy logic in solving problems in construction, where we have incomplete and imprecise information.

Publisher

Vilnius Gediminas Technical University

Subject

Strategy and Management,Civil and Structural Engineering

Cited by 16 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3