INFLUENCE OF GOVERNMENT CREDIT RISK ON PPP PROJECTS IN OPERATION STAGE

Author:

Zhou Yining1,Liu Jicai1

Affiliation:

1. School of Economics and Management, Southwest Jiaotong University, Chengdu, China

Abstract

In PPP projects, insufficient risk management may lead to the breakdown of partnerships and even project failures. Among them, the government credit risk is regarded as unbearable risk and a key risk affecting PPP projects because of its high frequency and impact. Therefore, based on the contractual relationship between both sides, a principal-agent model for the optimal choice of investors and the government under the government default probability is constructed. This paper explored the quantity relationship of the government credit risk and the project utility through analysing the effect of government default probability perceived by both parties on the investor’s optimal effort level and government allocation ratio. The results demonstrate that the government credit risk will decrease the effort level of investors and have a negative impact on the utility of the project. Furthermore, the government’s modification of the contract allocation ratio based on its own credit rating can offset the negative impact of its credit risk on the effectiveness of the project. But this regulatory effect is limited. The findings effectively provide some insights and theoretical basis for solving the negative effects of government credit risk.

Publisher

Vilnius Gediminas Technical University

Subject

Strategy and Management

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3