Optimization of Hydropower Generation potential of Arjo Dedessa Dam

Author:

Kishe Chimdesa Regasa1

Affiliation:

1. Wolkite University

Abstract

Abstract Hydropower has been developed to have a positive impact on the quality of life for rural residents in many ways. It offers a wide range of facilities, such as improved lighting, energy for small industries, schools, computer and communication service centers, and clinics. Ethiopia has constructed numerous dams for irrigation and water supply, yet these structures may have untapped potential for other purposes. One example of such a dam is the Arjo Dedessa Irrigation Dam located in western Ethiopia. Advanced optimization models have been developed to maximize the annual energy generation from the Arjo Dedessa Dam, while taking into account restrictions on water release for irrigation and ecological purposes, as well as the need to maintain maximum reservoir yield and storage capacity. The model was analyzed using LINGO software for different probabilities of mean annual inflow exceedance. Two scenarios for hydropower retrofitting were evaluated. The scenario of independent hydropower release with reservoir inflows at 50%, 75%, and 90% probabilities of exceedance results in a total annual hydropower output of 4.8 MW, 4.34 MW, and 0.99 MW, respectively. The matching values for the scenario of complementary hydropower release were 5.27 MW, 4.55 MW, and 1 MW, respectively. The study also measured the potential increase in the reservoir's live storage capacity to 1945.01 Mm3 by utilizing flood storage, which would allow for a maximum draft increase to 285.74 Mm3. With an upper limit on storage and draft, and reservoir inflows with probabilities of exceedance at 50%, 75%, and 90%, the hydropower production increased correspondingly to 6.51 MW, 4.54 MW, and 1.935 MW for the scenario of independent hydropower release arrangement. For the scenario of complimentary hydropower release, the hydropower production improved to 6.75 MW, 4.58 MW, and 1.94 MW respectively. The outcomes specify that the Arjo Dedessa Dam is appropriate for the production of hydroelectric power and that its generation potential is between 6.51 and 6.75 MW.

Publisher

Research Square Platform LLC

Reference38 articles.

1. ‘Optimal Sizing of a Run-of-River Small Hydropower Plant’;Anagnostopoulos John S;Energy Conversion and Management,2007

2. ‘Optimal Reservoir Operation for Hydropower Generation Using Non-Linear Programming Model’;Arunkumar R;Journal of The Institution of Engineers (India): Series A,2012

3. Bhandari, Ramchandra, Lena Ganda Saptalena, and Wolfgang Kusch. 2018. ‘Sustainability Assessment of a Micro Hydropower Plant in Nepal’. Energy, Sustainability and Society 8(3): 1–15. https://energsustainsoc.biomedcentral.com/articles/10.1186/s13705-018-0147-2 (December 14, 2021).

4. ‘Renewable Energy for a Clean and Sustainable Future’;Bilgen Selçuk;Energy Sources,2004

5. ‘Renewable Energy Resources: Current Status, Future Prospects and Their Enabling Technology’;Ellabban Omar;Renewable and Sustainable Energy Reviews,2014

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3