Abstract
The structural analysis of a road foldable prefabricated steel Bailey- type bridge located over the Tuga River in Żelichowo, Poland is performed in this paper. Interesting and untypical bridge redevelopment performed made it possible to lift the middle foldable bridge span by approximately 4.0 m concerning the existing state. The paper begins with a survey of literature carried out on the investigations of foldable Bailey-type bridge subject matter. A description of the numerical modelling of foldable prefabricated bridges is performed. The comparison of the proof load test results with the FEM numerical model results has shown very good compatibility. This paper can provide scientists, engineers, and designers the basis for structural analysis in the field of foldable Bailey-type bridge constructions and numerical simulations.
Publisher
Riga Technical University
Reference36 articles.
1. 70th Infantry Division Association. (n.d.). 70th Infantry Division Association. Retrieved 22 April 2023. www.trailblazersww2.org
2. Bailey, D. C., Foulkes, R. A., & Digby-Smith, R. (1948). The Bailey bridge and its development. In The civil engineer in war (pp. 373–410). London: Thomas Telford Ltd. https://doi.org/10.1680/ciwv1.45170.0022
3. Białobrzeski, T. (1978). Mosty składane (Folding bridges). Warsaw, Poland: Wydawnictwa Komunikacji i Łączności.
4. Biondini, F., & Malerba, P. G. (2016). Structural collapse analysis of a Bailey bridge. In Maintenance, monitoring, safety, risk and resilience of bridges and bridge networks (1 st ed., pp. 407–407). CRC Press. https://doi.org/10.1201/9781315207681-232
5. Bocian, M., Nikitas, N., Kalybek, M., Kużawa, M., Hawryszków, P., Bień, J., Onysyk, J. & Biliszczuk, J. (2023). Dynamic performance verification of the Rędziński Bridge using portable camera-based vibration monitoring systems. Archives of Civil and Mechanical Engineering, 23(1), Article 40. https://doi.org/10.1007/s43452-022-00582-7
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献