Submittal and Evaluation Procedures for Alternative Technical Concepts

Author:

Gad Ghada M.1,Gransberg Douglas D.2,Loulakis Michael3

Affiliation:

1. Department of Construction Management, Bowling Green State University, 125B Technology Building, Bowling Green, OH 43402.

2. Department of Civil, Construction, and Environmental Engineering, Iowa State University, 494 Town Engineering Building, Ames, IA 50010.

3. Capital Project Strategies, LLC, 11710 Plaza America Drive, Suite 2000, Reston, VA 20190.

Abstract

Alternative technical concepts (ATCs) have yielded innovative solutions to complicated design issues in a wide range of highway projects. Through ATCs, proposers are allowed to suggest modifications to a contract requirement to provide a project design equal to or better than the one described in the solicitation. However, the realization of such benefits requires a well-structured ATC mechanism, and the project's solicitation documents need to be drafted in a manner that clearly communicates the owner's project goals and ensures fairness and confidentiality to competing contractors. This paper describes the submittal, evaluation, approval, and review procedures currently followed by state transportation agencies to implement ATCs. The study employed a survey that was sent to all state departments of transportation (42 of which responded), in addition to a content analysis of the solicitation documents of 65 ATC projects from 24 agencies. The paper finds that care must be taken to ensure that competing contractors are not discouraged from pursuing ATCs as a result of onerous documentation requirements for ATC submittals. The results also show that the ATC submittal procedures should provide detailed guidance on the conduct and character of one-on-one meetings with competitors, the content of a responsive ATC submittal, and the procedures for the rectification of errors, omissions, and ambiguities. The document should also be clear about what constitutes an ATC and describe the ATC evaluation and review process, as well as the process for presenting proposed ATCs. The ATC evaluation criteria should be known when the solicitation is first published.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Investigating the Impact of Alternative Technical Concepts for Project Delivery of Accelerated Bridge Construction;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2023-05

2. Exploring a Progressive Design-Build Best-Value Delivery Method in Highway Construction;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2021-02

3. Estimating Preconstruction Services for Bridge Design Projects;Journal of Management in Engineering;2020-07

4. Confidentiality Issues with Alternative Technical Concepts during Design-Build Project Procurement;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2020-02

5. Assessment of State Agencies’ Practices in Managing Geotechnical Risk in Design–Build Projects;Transportation Research Record: Journal of the Transportation Research Board;2017-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3