1. Det Norske Veritas (DNV): ‘Joint Industry Project Summary Report from the JIP on the Capacity of Grouted Connections in Offshore Wind Turbine Structures’. Technical Report No: 2010‐1053 rev. 05 Det Norske Veritas AS 2011
2. Det Norske Veritas (DNV) DNV‐OS‐J101: ‘Offshore Standard: Design of offshore wind turbine structures’. Det Norske Veritas AS January 2013
3. van derTempel J. Lutje Schipholt B.: ‘The Slip‐Joint Connection Alternative connection between pile and tower’. DOWEC report‐F1W2‐JvdT‐03‐093/01‐P Dutch Offshore Wind Energy Converter project 2003 Delft University of Technology 2003
4. Jonkman J. Musial W.: ‘Offshore code comparison collaboration (OC3) for IEA task 23 offshore wind technology and deployment’. Technical Report NREL/TP‐5000‐48191 National Renewable Energy Laboratory December 2010
5. Forced vibrations with combined viscous and coulomb damping;Den Hartog J.P.;Philos. Mag., S.7,1930