1. OCCTO Investigation Committee: ‘The investigation committee on the Major blackout by the 2018 hokkaido eastern iburi earthquake’ (OCCTO Investigation Committee 2018). Available athttps://www.occto.or.jp/iinkai/hokkaido_kensho/files/Final_report_hokkaido_blackout.pdf accessed 27 August 2019
2. European Commission: ‘Network code on electricity emergency and restoration. Commission regulation (EU) 2017/2196’ 2017
3. Federal energy Regulatory Commission and the North American Electric Reliability Corporation and its regional Entities: ‘Report on the FERC‐NERC‐regional entity joint review of restoration and recovery plans’ (FERC‐NERC‐Regional Entity 2016)
4. Vulnerability analysis of the nordic power system;Doorman G.L.;IEEE Trans. Power Syst.,2006
5. Kjølle G.H. Gjerde O.: ‘Vulnerability analysis related to extraordinary events in power systems’.IEEE PowerTech Eindhoven July2015