Affiliation:
1. Institut social'no-ekonomicheskih i energeticheskih problem Severa FIC Komi NC UrO RAN
Abstract
In modern conditions of market relations in the electric power industry, a mechanism is needed to regulate the purchase and sale of power, which should not lead to a deterioration in the reliability of the energy power system. Competitive power take-off became the main component of this mechanism. Within its framework, nuclear power plants, hydroelectric power plants, new power units, as well as thermal power plants, which are necessary for heat supply to consumers, are compulsorily selected. The article examines the process of price formation for capacity, its relationship with demand, and shows the main features that affect its final indicators.
Subject
General Earth and Planetary Sciences,General Energy
Reference7 articles.
1. BESSER J.G, FARR J.G, TIERNEY S.F. The Political Economy of Long-Term Generation Adequacy: Why an ICAP Mechanism is Needed as Part of Standard Market Design // Electricity Journal. – 2002. – Vol. 15, Issue 7. – P. 53–62., BESSER J.G, FARR J.G, TIERNEY S.F. The Political Economy of Long-Term Generation Adequacy: Why an ICAP Mechanism is Needed as Part of Standard Market Design // Electricity Journal. – 2002. – Vol. 15, Issue 7. – P. 53–62.
2. CRAMTON P., STOFT S. A Capacity Market that Makes Sense // Electricity Journal. – 2005. – Vol. 18, Issue 7. – P. 43–54., CRAMTON P., STOFT S. A Capacity Market that Makes Sense // Electricity Journal. – 2005. – Vol. 18, Issue 7. – P. 43–54.
3. [Электронный ресурс]. – URL: https://so-ups.ru/index.php?id=markets, [Jelektronnyj resurs]. – URL: https://so-ups.ru/index.php?id=markets
4. [Электронный ресурс]. – URL: https://www.np-sr.ru/ru/market/wholesale/index.htm, [Jelektronnyj resurs]. – URL: https://www.np-sr.ru/ru/market/wholesale/index.htm
5. Федеральный закон «Об электроэнергетике» от 26.03.2003 №35-ФЗ., Federal Law «On the Electricity Industry» dated March 26, 2003 No. 35-FL.