1. As p-values of algorithms in mt10c1 and 15a are both greater than 0.05, the variances are also equal. Conversely, the p-value for [8 � 8] instance is less than 0.05 from Figure 19, so we reject the original hypothesis, it means that the variances for Motaghedi-larijanie instances are not equal;Figure 19, 20 and 21, respectively
2. The evolution of production scheduling from industry 3.0 through industry 4.0;Z Jiang;International Journal of Production Research,2022
3. Job-shop scheduling with multi-purpose machines;P Brucker;Computing,1991