1. Investigation of the potential for applying freeform processes to construction;R Buswell;The 3rd International Conference on Innovation in Architecture, Engineering and Construction (AEC),2005
2. Print time vs. elapsed time: A temporal analysis of a continuous printing operation for additive constructed concrete;B N Diggs-Mcgee;Additive Manufacturing,2019
3. Conventional Construction and 3D Printing: A Comparison Study on Material Cost in Jordan;R Allouzi;Journal of Engineering,2020
4. Architectural Evaluation of 3D-Printed Buildings;R Garc�a-Alvarado;Buildings,2021