Author:
zhang xinbo,Cui Chuang,Zhang Qing-hua,Zhang Xu,Zhou Yin-long
Reference37 articles.
1. Evaluation of cracking in the rib-to-deck welds of the Bronx-Whitestone Bridge;J W Fisher;Journal of Bridge Engineering,2016
2. Review on fatigue problems of orthotropic steel bridge deck;Q H Zhang;China Journal of Highway and Transport,2017
3. Vehicle-induced fatigue damage prognosis of orthotropic steel decks of cable-stayed bridges;C Cui;Engineering Structures,2020
4. Three-dimensional fatigue crack propagation analysis of welded steel beam based on global-local numerical model;L Zong;Advances in Bridge Engineering,2021
5. Fatigue process of rib-todeck welded joints of orthotropic steel decks;B Wang;Theoretical and Applied Fracture Mechanics,2019