Author:
Cao Chuang,Xie Zhengzheng,Zhang Nong,Han Changliang,Yan Guojie,Mu Fengchun,Zhang Wenquan
Reference38 articles.
1. Numerical Investigation of the Influence of Roof-Cutting Parameters on the Stability of Top Coal Gob-Side Entry Retaining by Roof Pre-Fracturing in Ultra-Thick Coal Seam;Y Yang;Energies (Basel),2023
2. Study on deformation mechanism and control technology of surrounding rock during reuse of gob side entry retaining by roof presplitting;F He;Eng Fail Anal,2022
3. Stability Analysis of a Non-pillar-Mining Approach Using a Combination of Discrete Fracture Network and Discrete-Element Method Modeling;G L Zhu;Rock Mech Rock Eng,2020
4. Validation study of nopillar mining method without advance tunneling: A case study of a mine in China;X Yang;Energy Sci Eng,2021
5. A Case Study on Gob-Side Entry Retaining Technology in the Deep Coal Mine of Xinjulong;P Wang;Advances in Civil Engineering 2020,2020