Author:
Zhou Yuxuan,Naim Mohamed,Gosling Johnathan,Wang Xun
Reference25 articles.
1. Engineer-to-order (ETO) production planning and control: An empirical framework for machinery-building companies;F Adrodegari;Production Planning and Control,2015
2. Dynamic Simulation Model for Project Change-Management Policies: Engineering Project Case;R Ansari;Journal of Construction Engineering and Management,2019
3. Assessing the impact of performance determinants in complex MTO/ETO supply chains through an extended hybrid modelling approach;C Barbosa;Journal of Construction Engineering and Management,2004
4. On quality and complexity: non-conformance failures, management perspectives and learning outcomes on a highways megaproject;P Dallasega;How Big Things Get Done,2017