Author:
Zhou Jingwen,Meng Tao,Jia Yangli
Reference50 articles.
1. Recent trends in distributed production network scheduling problem;N Bagheri Rad;Artificial Intelligence Review,2022
2. Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times;S Behjat;European Journal of Industrial Engineering,2017
3. An improved multi-population genetic algorithm with a greedy job insertion inter-factory neighborhood structure for distributed heterogeneous hybrid flow shop scheduling problem;H Cui;Expert Systems with Applications,2023