1. CARDINAL F., Non, Jensen ne dessinera pas le futur pont Champlain…, La Presse.ca, Montréal, 2nd December 2013.
2. Working Group 3, IABSE Guidelines for Design Competitions for Bridges, International Association for Bridge and Structural Engineering, Zürich, 2013.
3. The Øresund Bridge: Project development from competition to construction;Klaus Falbe-Hansen
4. Forth Replacement Crossing: Scheme design of the bridge;Matt Carter
5. CARTER M., CARSTAIRS N., MATUSEWITCH P. and YIP S., Gerald Desmond Bridge Replacement: Seismic Design of the Main Span Bridge. Proceedings of the Seventh National Seismic Conference on Bridges and Highways, Oakland, 2013.