Affiliation:
1. University of Zagreb, Croatia
Abstract
A stuck pipe is a common worldwide drilling problem in terms of time and financial cost. It causes significant increases in non-productive time and losses of millions of dollars each year in the petroleum industry. There are many factors affecting stuck pipe occurrence such as improper mud design, poor hole cleaning, differential pressure, key seating, balling up of bit, accumulation of cuttings, poor bottom hole assembly configuration, etc. The causes of a stuck pipe can be divided into two categories: (a) differential sticking and (b) mechanical sticking. Differential-pressure pipe sticking occurs when a portion of the drill string becomes embedded in a filter cake that forms on the wall of a permeable formation during drilling. Mechanical sticking is connected with key seating, formation-related wellbore instability, wellbore geometry (deviation and ledges), inadequate hole cleaning, junk in hole, collapsed casing, and cement related problems. Stuck pipe risk could be minimized by using available methodologies for stuck pipe prediction and avoiding based on available drilling parameters.
Reference37 articles.
1. Aadnøy, B. S., Larsen, K., & Berg, P. C. (1999). Analysis of stuck pipe in deviated boreholes. Paper presented at the 1999 SPE Annual Technical Conference and Exhibition. Houston, TX.
2. Al-Baiyat, I., & Heinze, L. (2012). Implementing artificial neural networks and support vector machines in stuck pipe prediction. Paper presented at the SPE Kuwait International Petroleum Conference and Exhibition. Kuwait City, Kuwait.
3. Ayers, R. C., O’Reilly, J. E., & Henry, L. R. (1989). Offshore operators committee Gulf of Mexico spotting fluid survey. Paper presented at the 1989 SPE/IADC Drilling Conference. New Orleans, LA.
4. Boomer, R. J. (1995). Predicting production using a neural network. Paper presented at the Petroleum Computer Conference. Houston, TX.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献