Risks and Projects Phases

Author:

Abstract

This chapter provides the rational for the importance of developing an effective and efficient replica for risks in PPP arrangement in order to optimize measures to handle them. Various attempts have been made to dig up all the risks in the project phases as an alternative service delivery improvement but to date there has been a lack of proper analogies of risks in the PPP project phases. This is also a lack of clear codification for risk of the project phases in the literature to provide useful benchmark mechanisms to improve a particular phase and to share risk optimally. The aim of this chapter is to develop a conceptual replica to comprehend risks in the project phases, and to determine means to advance risk-free PPP project phase. The different case studies will be examined in an effort to simplify the tasks of creating a risk-free PPP projects. In unearthing the melodrama in handling risks in PPP project phases, it is concluded that there is a lack of proper risk sharing formula that make most PPP projects to fail and a lack of emphasis in designing a less risk prone PPP projects.

Publisher

IGI Global

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3