Author:
Gladkih A M,Yu Konyuhov V,Galyautdinov I I,Shchadova E I
Abstract
Abstract
In order to improve the organization and performance of equipment maintenance, innovative proposals were developed and implemented. The explanations were taken into account when determining the methods for evaluating the maintenance performed for the joint approval of a unified methodology of applying the concept of a standard hour. The planning of performing equipment maintenance by day during the whole month was revised, which, in turn, allowed minimizing significant fluctuations in the scope of work and eliminating peak loads. The works on the maintenance of the mechanical and energy components of a single assembly were revised and combined as much as possible, which ensured the more efficient use of working time. Work has been organized on updating the composition of the operations to be performed, since the scope of maintenance work in the assignment forms is not always representative of the complex of necessary operations. Preventive work with subordinate personnel is organized in the field of improving the industrial standards in the workplace.
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献