Abstract
Abstract
In land development and utilization projects, managers rarely consider the loss of ecosystem service value, often resulting in waste of resources. Based on the land development and utilization project, this paper proposes a multi-indicator cost-benefit comprehensive analysis model (MCCAM). MCCAM divides the four aspects of the indicator system by dichotomy, including determining resource loss costs through MESV, calculating environmental degradation costs using delay factors, considering project planning factors and market fluctuations, and correcting economic benefits and costs. On the other hand, MCCAM quantifies the value of the ecosystem service value model and combines the non-equalized cobweb model with time-delay effects to modify the model parameters. According to the sensitivity analysis of the model, this model provides effective suggestions for the planning and management personnel of the land development and utilization project.
Reference19 articles.
1. An Excel Spreadsheet Model for States and Districts to Assess the Cost-Benefit of School Nursing Services [J];Wang;Nasn School Nurse,2016
2. Novel model of direct and indirect cost-benefit analysis of mechanical embolectomy over IV tPA for large vessel occlusions: a real-world dollar analysis based on improvements in Mrs [J];Mangla,2016
3. Cost Benefit Analysis to assess urban mobility plans. Consumers’ surplus calculation and integration with transport models [J];Beria;MPRA Paper,2014
4. Cost Benefit Analysis to assess urban mobility plans. Consumers’ surplus calculation and integration with transport models [J];Beria;MPRA Paper,2014
5. Correction to: Combining multicriteria decision analysis and cost-benefit analysis in the assessment of maritime projects financed by the European Investment Bank [J];Mark,2018
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献