Author:
Susanti S D,Sutopo W,Ngadiman N H A
Abstract
Abstract
A decision situation often encountered by a company is whether an existing asset should be retired from use, continued in service, or replaced with new technology to improve productivity and competitiveness. The purpose of this paper is to present an equipment replacement analysis, an electronic components company. This study aims to analyze three proposed robots to automate the production line as a challenger versus an old manual production line as a defender in palletizing activities. We offered both Market and Technical analysis as well as investment analysis for evaluating an automatic line. Data are analyzed, and four methods are considered for determining project feasibility, namely NPV, IRR, Payback Period, and CBA. According to the data analysis, it is found that Borunte’s robot is the best alternative compare with the others. The proposed framework of equipment analysis seems to be helpful to the company to solve equipment replacement studies.
Reference21 articles.
1. Evolving Paradigms of Manufacturing: From Mass Production to Mass Customization and Personalization;Hu;Procedia CIRP.,2013
2. Productivity improvement in poly-cover packing line through line balancing and automation;Harikrishnan,2020
3. Improving productivity using work-study technique;Biswas;Int. J. Res. Eng. Appl. Sci.,2016
4. Productivity improvement of forging section using work-study and automation in existing axle manufacturing plant;Bagri;Int. J. Mech. Prod. Eng.,2014
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献