Author:
Filipovich O V,Balakin A I,Balakina N A
Abstract
Abstract
Functioning of conrod-piston group of internal combustion engine is considered. It is shown that the main method of assembly of this unit is selective assembly, which provides the required accuracy of parts joints. The scheme of the assembly set-making is given, a mathematical model of the process of its selective assembly with the selected strategy is built. As a strategy, a single-variant set-making is proposed, in which the assembly is carried out from the groups of the same numbers. The constructed model allows to determine the process indicators, in particular, the probability of obtaining suitable assembled sets, the probability of incomplete elements, forming work in progress and preliminary scrappage. The task of optimal assembly of rod-piston group at specified values of extended tolerances and arrangement of tolerance intervals by rational selection of boundaries of selective groups is set. The solution of this task is given.
Reference15 articles.
1. Optimized selection of assembly sets for multivariate dimensional completion schemes;Serdobintsev;News of Volgograd State Technical University,2006
2. Investigation of the influence of measurement uncertainty details on the collection precision of the joints;Kesoyan;News of Volgograd state technical University,2009
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献