Implementation of lean manufacturing using waste assessment model model (WAM) in food industry (case study in usaha mikro kecil menengah (umkm) xyz)

Author:

Febianti E,Irman A,Juliana M

Abstract

Abstract The waste occurring on the production line leads to inefficient production and loss to the company. Based on the results of brainstorming with UMKM XYZ owners, it is known that there is a reduction in the production time of up to 20% of the production time is 4 hours per cycle. The waste that occurs will be identified and minimized using methods of Waste Assessment Model (WAM) and Fault Tree Analysis (FTA) for proposed repairs. The purpose of the research is to calculate the percentage of waste and know the dominant waste, knowing the repair to minimize the largest waste, and calculating the amount of production time. The results showed that the dominant waste was the transportation of 17,09% with improvements was to change the layout of the production, change the design of tools, expand the production floor, implement a more integrated fixed contract system and minimize the production process. The average time that can be minimized for donut products, bread, and molen is 490 seconds per cycle or 8.167 minutes per cycle.

Publisher

IOP Publishing

Subject

General Medicine

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3