Optimal order of construction of facilities in complex development with minimal additional costs

Author:

Mailyan Alexander,Korol Elena,Petrosyan Rima,Antoniadi Diana

Abstract

Abstract Stream methods of work during the construction of a group of construction projects provide the selection of priorities in the optimization of calendar plans. This can be a reduction in the duration of construction or resource provision in time. Due to the change in the arrangement of objects in the stream, the total duration of the work on the entire object complex can be changed. By the methods of organizational and technological modeling, a rational sequence of work is selected taking into account the optimization of resource costs. When constructing a complex of objects, a comparative analysis of various combinations of grouping objects, using the methods of decomposition and aggregation, allows you to carry out a numerical rating of various parameters of the work, such as duration, labor, providing material and technical resources, etc. This ensures the optimal ratio between the duration of the construction of the object complex and additional costs that arise during the parallel construction of several objects. A graphical interpretation of the choice of the optimal organizational and technological solution is work schedules at the facilities, allowing differentially and integrally to evaluate the development of material and technical resources.

Publisher

IOP Publishing

Subject

General Medicine

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3