Tarigan U,Siregar I,Siregar K,Tarigan UPP
Abstract
Abstract
Every association tries to always create an effective and efficient production process. High competition in the industrial world during this time has led to industrial growth which has influence to a company to increase overall productivity in their production activities. For a production activity, in order to obtain an optimum result, all production activities must first be planned properly. Production scheduling is very important in the production process of a product in the company. The first come first served scheduling system currently implemented by the company capable to produce an appropriate scheduling. This causes the high total lead time (makespan) resulted and makespan obtained does not meet the due date. Therefore, it is necessary for rescheduling in order to decrease the overall total lead time to meet customer orders. The study design uses the ant colony algorithm to design the scheduling of door leaf production. The result shows that production scheduling using the ant colony algorithm resulted in scheduling sequences based on the length of lead time are job 1-job 6-job 4-job 3-job 5-job 2. The ant colony method is able to decrease slightly the total lead time product of 3,06%.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献