Tamura J,Kondo Y,Yee-Rendon B,Meigo S,Maekawa F,Kako E,Umemori K,Sakai H,Dohmae T
Abstract
Abstract
The Japan Atomic Energy Agency (JAEA) has been proposing an accelerator-driven nuclear transmutation system (ADS) as a future nuclear system. In preparation for the actual design of the CW proton linac for the JAEA-ADS, we are now prototyping a low-β (≈ 0.2) single-spoke cavity. The cavity fabrication started in 2020. Most of the cavity parts were shaped in fiscal year 2020 by press-forming and machining. In 2021, we started welding the shaped cavity parts together. By preliminarily investigating the optimum welding conditions using mock-up test pieces, each cavity part was joined together with smooth welding beads. So far, we have fabricated the body section and the beam port sections. By measuring the resonant frequency of the temporarily assembled cavity, it was confirmed that there were no significant problems with the cavity fabrication.