Author:
Liu Junfeng,Ma Xiaolong,Zhang Ruixiang,Gao Yufeng
Abstract
Abstract
Introduced tianjin Chen tang zhuang coal to natural gas power plant relocation project issue 2 sets of 900 mw level “two tow one” gas-steam combined cycle unit coordinated control system, in view of the different operation way, used the load distribution is different, and introduce the PID algorithm for load distribution is modified, realize the coordination of total load control unit. Under the way of automatic generation control (AGC), with 30 mw/min rate of rise and fall of the load to load disturbance test results show that the unit operation stability, good load capacity and load in the process of adjusting the maximum dynamic load deviation < 6 mw, and the average static load deviation < 4 mw. It also introduced the unit under the different operation modes, gas turbine, waste heat boiler, steam turbine and generator consideration when the tripping happens in the four major equipment failure, the mutual interlocking protection function.
Subject
General Physics and Astronomy
Reference6 articles.
1. Coordinated Model Predictive Control of Aircraft Gas Turbine Engine and Power System;Anouck;Journal of Guidance, Control, and Dynamics,2013
2. Modeling and control of distributed generation systems including PEM fuel cell and gas turbine;Radman;Electric Power System Research,2007
3. Method for the control and protection of a gas turbine and gas turbine using such method;Andre,2005
4. Analysing the benefits of hybridisation and storage in a hybrid solar gas turbine plant;Ellingwood;International Journal of Sustainable Energy,2019