Commissioning and First Results of the SSRF Phase-II Beamline Project

Author:

Tai Renzhong,Zhao Zhentang

Abstract

Abstract The SSRF Phase-II Beamline Project started November 20, 2016 with a 6-year construction period. This project is mainly to construct 18 new beamlines and more than 30 end-stations, as well as the corresponding storage ring upgrades, the user auxiliary laboratories, the beamline technology support laboratories, and the infrastructures. Till now, 11 beamlines have passed the technical acceptance test and been in running. The remaining seven beamlines will be finishing their technical acceptance test soon. The commissioning of the upgraded accelerator is successful including the lattice modification, the new 3rd harmonic superconducting cavity installation and the 650 W helium cryogenic system construction.

Publisher

IOP Publishing

Subject

General Physics and Astronomy

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Accelerating imaging research at large-scale scientific facilities through scientific computing;Journal of Synchrotron Radiation;2024-08-27

2. Overview of SSRF phase-II beamlines;Nuclear Science and Techniques;2024-07-26

3. A new experimental station for microbeam X-ray scattering at the SSRF BL10U1 beamline;Journal of Applied Crystallography;2024-03-29

4. Orbit stabilization for the new insertion devices in SSRF;Journal of Instrumentation;2024-01-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3