Unauthorised Instructions in Civil Engineering Project: Contributing Factors

Author:

Ismail W N W,Adnan H,Masrom M A N,Baharuddin H E A,Ismail N A A

Abstract

Abstract The civil engineering project, by its very nature, is a big user of natural resources. Nevertheless, with growing concerns on the climate change and the limit nature of these resources, there is increasing pressure to ensure the implementation of the construction to be completed within the stipulated quality, cost and time. This is due to the severity impacts on the environment it causes in the event that there is prolongation in the construction duration or face abandonment. Hence, this study looks upon the occurrence of unauthorised instructions as it is among the significant factor causing the project problems and delay. This paper aims to investigate the occurrence of unauthorised instruction in civil engineering projects and to determine the significant factors causing it. The data was obtained from professional civil engineers and Grade G7 contractors registered with their respective organisations i.e Board of Engineers Malaysia (BEM) and the Construction Industry Development Board (CIDB). From 288 questionnaire survey returns, this study determined that the occurrence of unauthorised instructions in civil engineering projects in Malaysia was at a moderate level. There were seven significant factors contributing to it namely poor in complying with the condition of contract, level of understanding condition of contract, ground uncertainty, the familiarity of procurement method used, tight project milestone, clarity of SFoC and project complexity. These seven factors if properly understood and be put more concern by all parties at the onset of every project may ensure the project can be successfully completed on time and eventually could reduce damage to the environment.

Publisher

IOP Publishing

Subject

General Engineering

Reference26 articles.

1. The Comparative Study of International Standard Form of Building Contract (Fidic Conditions of Contracts for Construction - the New Red Book 1999) and Malaysian’S Standard Form of Building Contract (Pwd 203a);Zulkifli,2011

2. The PAM 2006 Standard for of Building Contract-a change in risk allocation;Rajoo;Malaysian Law Journal,2010

3. Role of engineer under FIDIC form contract;Lina;Journal of Professional Issues in Engineering Education and Practice,1997

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3