Abstract
Abstract
The large diameter super-long bored pile’s bearing capacity is generally very high. The self-balanced method is a new type of static load test method, and it is suitable for the test. At Yueqing Bay No. 1 Bridge, a pile with diameter of 2500 mm and length of 112.0 m was discussed in detail. The post grouting technology at pile bottom was used. The self-balanced method was carried out before and after post grouting. The double layer load cell test method was introduced. The ultimate bearing capacity of the upper, the middle, and the lower part piles were obtained. The test results were converted to the traditional top-down method. The ultimate bearing capacity before grouting was 46932 kN, and it was 70680 kN after grouting. The increment percentage was 50.6%.
Reference10 articles.
1. Theory and practice of self-balanced loading test for pile bearing capacity;Gong,2002
2. Pile bottom post grouting technology and effect analysis of pile foundation of Yueqing Bay Bridge;Wang;China Water Transport,2017
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献