Empirical Method for Engineering Geological Evaluation of Pelosika Dam Diversion Tunnel Design, Southeast Sulawesi, Indonesia

Author:

Diwani J P,Marliyani G I

Abstract

Abstract This paper explains a Pelosika Dam Diversion Tunnel in metamorphic rocks (quartz muscovite phyllite) and aims to find out excavation methods, stand-up time, and support systems for tunnel construction. The purpose of this research is that the development of science in tunnel construction with the characteristic of metamorphic rock will increase. Tunnel location in poort rock mass quality based on previous geology investigations. Based on current geology and engineering geological mapping results, diversion tunnel through poor rock mass of metamorphic rocks (phyllite) which have slightly-highly weathered. We classified rock mass quality by GSI, RMR, and Q-System methods which produce the almost same results (poor rock mass quality). The GSI Chart and Pettifer-Fookes Chart which excavation method has the results of the digging and ripping. RMR value determines the stand-up time last 42-240 minutes after excavation. RMR and Q-System values generate the support system which used rock bolts (length= 1.8 m), shotcrete (thick=10-15 cm), and steel sets (spacing=1,5m) if required. A purpose of combination from the different excavation methods and support systems to complement each other and improve the safety of the tunnel without compromising the cost-effectiveness of construction.

Publisher

IOP Publishing

Subject

General Medicine

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3