Author:
Khoirunnisa H,Wibowo M,Gumbira G,Hendriyono W,Karima S
Abstract
Abstract
Reclamation plan in Jakarta Bay close to the power plant cooling water discharge location. It will affect hot water distribution system and possibly increase water temperature around the power plant intake location. The increase in water temperature at the intake location will disrupt the operation of the power plant. The impact of hot water discharge to the intake location can be reduced by extending the intake channel and building barrier walls as planned by the Muara Karang Power Plant. Modeling is done with 3 scenarios, namely the existing condition, the existence of the reclamation island, and the proposed infrastructure around the power. This modeling aims to determine the effect of the reclamation island on heat distribution, especially around the intake location and the effectiveness of the infrastructures in minimizing the problem. Simulation for the east and west monsoons is done in 3 dimensions with MIKE3 Flow Model FM (DHI) by applying temperature function. Overall, the presence of reclamation island will increase the average temperature at the intake by 0.32 to 0.7°C compared to the existing conditions, and the proposed infrastructure is quite effective to reduce the temperature at the intake by 0.5 to 0.8°C.
Reference18 articles.
1. Awareness Capacity of Muara Karang Generator Unit to Face the Failure of Environmental Impact Technology;Rosyidin;Geo Edukasi,2017
2. Thermal Dispersion Model of Water Cooling PLTGU Cilegon Ccpp Discharge Into Margasari Coastal Waters at the Western Coast of Banten Bay;Nurjaya;J. Ilmu dan Teknologi Kelautan Tropis,2010
3. Study of current circulation in Jakarta Bay. Proceed. of the 3rd Int. Sym. on Adv. and Aerospace Sci. and Tech. in Indonesia;Setiawan,1998
4. Review of Alternatives for Jakarta NCICD Project using Numerical Modeling;Jun,2019
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献