Author:
Rahman Humyun Fuad,Janardhanan Mukund Nilakantan,Nielsen Peter
Abstract
Purpose
Optimizing material handling within the factory is one of the key problems of modern assembly line systems. The purpose of this paper is to focus on simultaneously balancing a robotic assembly line and the scheduling of material handling required for the operation of such a system, a topic that has received limited attention in academia. Manufacturing industries focus on full autonomy because of the rapid advancements in different elements of Industry 4.0 such as the internet of things, big data and cloud computing. In smart assembly systems, this autonomy aims at the integration of automated material handling equipment such as automated guided vehicles (AGVs) to robotic assembly line systems to ensure a reliable and flexible production system.
Design/methodology/approach
This paper tackles the problem of designing a balanced robotic assembly line and the scheduling of AGVs to feed materials to these lines such that the cycle time and total tardiness of the assembly system are minimized. Because of the combination of two well-known complex problems such as line balancing and material handling and a heuristic- and metaheuristic-based integrated decision approach is proposed.
Findings
A detailed computational study demonstrates how an integrated decision approach can serve as an efficient managerial tool in designing/redesigning assembly line systems and support automated transportation infrastructure.
Originality/value
This study is beneficial for production managers in understanding the main decisional steps involved in the designing/redesigning of smart assembly systems and providing guidelines in decision-making. Moreover, this study explores the material distribution scheduling problems in assembly systems, which is not yet comprehensively explored in the literature.
Subject
Industrial and Manufacturing Engineering,Control and Systems Engineering
Cited by
41 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献