1. AACE
(2012),
Risk Analysis and Contingency Determination Using Expected Value
, AACE, Morgantown, WV, pp. 1-14.
2. Amaya, A.J.R.
,
Lengerke, O.
,
Cosenza, C.A.N.
,
Dutra, M.S.
and
Tavera, M.J.M.
(2009), “Comparison of defuzzification methods: automatic control of temperature and flow in heat exchanger”, in
Rodić, A.D.
(Ed.), InTech, pp. 77-88.
3. Anon
(2009), “Contingency misuse and other risk management pitfalls”,
Cost Engineering
, Vol. 51 No. 5, pp. 28-33.
4. Barraza, G.
(2011), “Cost contingency management”,
Jounral of Construction Engineering and Management
, Vol. 137 No. 4, pp. 259-265.
5. Barraza, G.
and
Bueno, R.
(2007), “Cost contingency management”,
Journal of Construction Engineering and Management
, Vol. 23 No. 3, pp. 140-146.