Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects

Author:

El-Kholy Amr MetwallyORCID,Akal Ahmed Yousry

Abstract

PurposeThis research investigates the financial viability risk factors that threaten the private investor's economic scheme in the public private partnership (PPP) wastewater treatment plant (WWTP) projects in Egypt. The aims of this study are to: (1) illustrate and cluster the financial viability risk factors in accordance with the PPP WWTP projects' nature, (2) assess the risk factors' criticality degrees according to their severity and frequency levels of the financial viability, and (3) pinpoint the suited allocation of the financial viability risk factors between the public and private parties.Design/methodology/approachRelying on the previous analysts' endeavors, the questionnaire method, the fuzzy synthetic evaluation approach and the hypothetical normal distribution curve model; the severity, frequency, criticality and allocation preference of 32 financial viability risk factors were assessed from 12 Egyptian PPP experts.FindingsThe data analysis yielded that foreign exchange risk, currency risk/inflation, license risk, construction cost-overrun and late site handover are the key factors in arising the financial viability risk issue in the PPP WWTP projects. Considering the discussion of these key risks, the study summarized that the financial viability's key risk factors are notably be affected by the economic, political and administrative circumstances of the host county. Additionally, the inflation lesion was found to be the core reason of most of the key risk factors.Originality/valueThis research originality stems from its contribution to address the gab in the PPP risk assessment literature of the concessionaire's financial viability in the WWTP projects in a country of developing economy as Egypt. This, first, enriches the scholarly based knowledge of the PPP projects' risk analysts of the developing countries. Accordingly, it moves the current PPP risk assessment research further to deeply apprehend these markets' risks. Second, it equips the policymakers in the public and private sectors of such projects with a map that clarifies their assigned risk factors and the responsibilities that each party should bear to generate a mutual stable investment environment for achieving their aims successfully. This, indeed, paves the way for more private investments to be involved in the developing markets' PPP projects with a profitable satisfactory level for the private concessionaire. In the same vein, more WWTP projects, which are highly needed for the public sector and its people, are executed.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference69 articles.

1. Role of financial risks in BOT megatransportation projects in developing countries;Journal of Management in Engineering,2017

2. Efficient risk transfer in PPP wastewater treatment projects;Construction Management and Economics,2015

3. Evaluating key risk factors for PPP water projects in Ghana: a Delphi study;Journal of Facilities Management,2015

4. Evaluation and ranking of risk factors in public–private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach;Expert Systems with Applications,2015

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3