Towards a conceptual framework to manage BIM/COBie asset data using a standard project management methodology

Author:

Alnaggar Ahmed,Pitt Michael

Abstract

Purpose The purpose of this paper is to investigate a systematic methodology to manage asset data flow between building stakeholders throughout building life cycle using the Construction Operation Building Information Exchange (COBie) standard. Design/methodology/approach A literature review of the relevant building information modelling (BIM) for facilities management (FM) studies including the gaps and challenges of producing COBie data is analysed. Then a standard project management methodology by Project Management Institute (PMI) is introduced as a theoretical framework to map the different areas of managing COBie data as a project in coordination with Royal Institute of British Architects (RIBA) Plan of work. This theoretical background is coupled with an inductive approach through the placement within a construction company (Bouygues, UK) in the UCLH construction project to produce the conceptual framework that is aligned with industry needs. Findings The lack of well-structured approach to manage COBie data throughout building life cycle causes many problems and confusions about the roles and responsibilities of different stakeholders in creating and managing asset data. This confusion in turn results in incomplete and low-quality COBie data at the handover phase which hinders the ability of facility managers to use these data effectively in the operations phase. The proposed conceptual framework provides a standard project management process to systemise the data flow among all stakeholders. Practical implications The proposed framework is developed in liaison with a large construction company, so it is well aligned with an actual industry approach to managing COBie data. Furthermore, it provides a systematic step-by-step approach to managing COBie as a project that could be easily implemented in actual construction projects. Originality/value The paper introduced a novel approach to manage COBie data using a standard project management methodology based on an actual live construction project perspective coupled with project management theory.

Publisher

Emerald

Subject

Management of Technology and Innovation,Strategy and Management,Business and International Management

Reference42 articles.

1. Towards green building performance evaluation using asset information modelling;Built Environment Project and Asset Management,2015

2. Digital Technologies in Facility Management – The state of Practice and Research Challenges;Procedia Engineering,2017

3. Integration of FM and asset management expertise in digital 3D building models;Journal für FM,2015

4. Building Information Modelling (BIM) in Facilities Management: Opportunities to be considered by Facility Managers;Procedia – Social and Behavioral Sciences,2016

5. Adopting BIM for Facilities Management: solutions for managing the Sydney Opera House,2007

Cited by 38 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3