Analyzing bidding competitiveness and success rate of contractors competing for public construction projects

Author:

Alkhateeb Ahmad M.,Hyari Khaled Hesham,Hiyassat Mohammed A.

Abstract

Purpose The purpose of this paper is to analyze and evaluate bidding competitiveness and success rate of contractors bidding for public construction projects (PCPs). Additionally, this research determines the effect of work sector, contractor’s classification category (experience), project size and number of bidders on contractors’ bidding competitiveness, and the influence of work sector and classification category on their success rate. Design/methodology/approach The data were collected through 2,296 bidding attempts for 289 tender projects that were announced by the Government Tenders Department in Jordan between 2013 and 2016. The research uses bid competitiveness percentage (BCP) to evaluate contractors’ bidding competitiveness. Pearson correlation is used to investigate the correlation among variables. Hypothesis testing using ANOVA was conducted to evaluate the effect of the abovementioned factors on contractors’ bidding competitiveness, and their success rate. Findings The results of the analysis indicate that contractors’ average BCP and success rate in Jordanian PCPs are 83.8% and 13.3%, respectively. The analysis also reveals that work sector, contractor’s classification category, project size and number of bidders significantly affect contractors’ bidding competitiveness, whereas classification category and work sector do not affect bidding success rate. Therefore, experience of contractors affects their bidding competitiveness, but does not affect their success rate. Originality/value The present research uses contractors’ bidding success rate as a measure to evaluate their bidding competitiveness for PCPs. The novel model of this research can be applied in any country, after considering local regulations, to measure and evaluate contractors’ bidding competitiveness, and success rate when bidding for PCPs. Also, contractors cannot depend on their experience (i.e. classification category) or increasing bidding attempts to win bids and improve bidding success rate, rather than enhance their bidding strategy.

Publisher

Emerald

Subject

Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3