Development of waste occurrence level indicator in Vietnam construction industry

Author:

Khanh Ha Duy,Kim Soo Yong

Abstract

Purpose – The purpose of this paper is to evaluate the waste occurrence level in the construction industry. It includes: first, identifying the mean value of frequency of waste occurrence according to respondents’ characteristics; second, identifying the main predictive factors for waste occurrence based on latent relationships between initial waste factors; and third, identifying the waste occurrence-level indicator (WOLI) for the construction industry based on the main waste measurement factors. Design/methodology/approach – A total of 19 waste factors were sorted from the literature review. A structured questionnaire was adopted to carry out the survey. The respondents are professionals who have much experience in construction and management of project. Shapiro-Wilk test of normality, Levene’s test, ANOVA test, and factor analysis technique were used to analyze the collected data. Findings – Frequency of waste occurrence in construction projects is quite high. There was no statistically and practically significant difference in means for waste occurrence between selected population categories. Based on factor analysis technique, there were five principal components extracted with 56.7 percent of total variance. The WOLI in the construction industry was found as 61.55 per the scale of 100. Research limitations/implications – The non-probability sampling was applied to collect data because of several certain limitations and difficulties. The number of data sets is relatively small. This study has only examined the frequency of waste occurrence without quantitative information. Practical implications – This is another study of waste factors in the construction industry, which is different from traditional waste studies. Originality/value – The contribution of this study to the practical project management is that a proposed evaluation sheet for WOLI could be applied for any construction firm.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference32 articles.

1. Alarcon, L.F. (1994), “Tools for the identification and reduction of waste in construction projects”, in Alarcon, L.F. (Ed.), Lean Construction , A.A. Balkema, Rotterdam, pp. 365-377.

2. Alarcon, L.F. (1995), “Training field personnel to identify waste and improvement opportunities in construction”, in Alarcon, L.F. (Ed.), Lean Construction , A.A. Balkema, Rotterdam, pp. 101-110.

3. Alsehaimi, A. , Koskela, L. and Tzortzopoulos, P. (2013), “Need for alternative research approaches in construction management: case of delay studies”, Journal of Management in Engineering , Vol. 29 No. 4, pp. 407-413.

4. Alwi, S. (2002), “Non value-adding activities in the Indonesian construction industry: variables and causes”, PhD dissertation, Queensland University of Technology, Brisbane.

5. Bossink, B.A.G. and Brouwers, H.J.H. (1996), “Construction waste: qualification and resource evaluation”, Journal of Construction Engineering and Management , Vol. 122 No. 1, pp. 55-60.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3