Risk management in guaranteed maximum price (GMP) contracts

Author:

Palihakkara Asha DulanjalieORCID,Perera B.A.K.S.ORCID

Abstract

PurposeGuaranteed maximum price (GMP) contracts are becoming an increasingly popular contract solution; however, many projects experience higher levels of risk and exceed predetermined GMPs, failing to accomplish the main motive behind the concept. Thus, the study identified a risk management process for GMP projects.Design/methodology/approachThe study adopted a quantitative approach consisting of three Delphi rounds. The collected data were analysed using statistical data analysis tools.FindingsThe study identified 17 highly significant risk factors in GMP projects and determined their levels of severity. Subsequently, risk allocation amongst the client, contractor and consultant and strategies to handle the most significant risk factors were determined. The study identified poorly defined scope and design changes as the most critical risks in GMP projects. Moreover, strategies such as clearly defining the project scope, preparing precise documentation, early involvement of the contractor and using a partnering approach can be deployed to reduce the risk in GMP projects. Each risk has to be assigned to the party who can best manage it, depending on its nature.Originality/valueThe study addresses the literature gap pertaining to risk management of GMP contracts by identifying its overall process, including the identification of significant risks based on the severity levels; risk allocation amongst the client, contractor and consultant; and identification of risk handling techniques suitable for each significant risk factor. The study contributes to the industry by identifying a systematic risk management process to implement GMP projects successfully within the stipulated time, cost and quality.

Publisher

Emerald

Subject

Urban Studies,Building and Construction,Renewable Energy, Sustainability and the Environment,Civil and Structural Engineering,Architecture,Cultural Studies

Reference65 articles.

1. Assessment of critical risk and success factors in construction supply chain: a case of Pakistan;International Journal of Construction Management,2020

2. Risk management trend in the Hong Kong construction industry: a comparison of contractors and owners perspective;Engineering, Construction and Architectural Management,1999

3. Risk management in construction projects;Journal of Advanced Management Science,2018

4. Application of Delphi method in construction engineering and management research: a quantitative perspective;Journal of Civil Engineering and Management,2016

5. Promises, pitfalls and shortfalls of the guaranteed maximum price (GMP) approach: comparative case study,2010

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Guest editorial – Future construction: design solutions and approaches;Smart and Sustainable Built Environment;2022-07-05

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3