Author:
Benmansour Rachid,Allaoui Hamid,Artiba Abdelhakim,Iassinovski Serguei,Pellerin Robert
Abstract
PurposeThe purpose of this study is to propose and model an integrated production‐maintenance strategy for a failure‐prone machine in a just‐in‐time context.Design/methodology/approachThe proposed integrated policy is defined and a simulation model is developed to investigate it.FindingsThe paper focuses on finding simultaneously two decision variables: the period (T) at which preventive maintenance actions have to be performed; and the sequence of jobs (S). These values minimize the maintenance costs (MC) and the expected total earliness and tardiness costs (ETC) away from a common due‐date D.Practical implicationsThe paper attempts to integrate in a single model the two main aspects of any manufacturing and production systems: production and maintenance. It focuses on a stochastic scheduling problem in which n immediately available jobs are to be scheduled jointly with the preventive maintenance. The effect of the period (T) and the sequence of job (S) on the expected total cost are shown through a numerical example.Originality/valueThe paper proposes an integrated model that links production, preventive maintenance and corrective maintenance. It is simultaneously focusing on the period (T) at which preventive maintenance actions have to be performed and the sequence of jobs (S) to reduce production and maintenance‐related costs.
Subject
Industrial and Manufacturing Engineering,Strategy and Management,Safety, Risk, Reliability and Quality
Cited by
19 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献