Comparison of toll and annuity PPPs: a case study of highway projects in India

Author:

Mangu Samhita,Annamalai Thillai Rajan,Deep Akash

Abstract

PurposeThe use of public–private partnership (PPP) approaches for developing infrastructure has been well recognized. The allocation of risk between public authority and private sector differs among the different types of PPP projects. The objective of the paper is to analyze the factors that influence the type of PPP and the performance of different types of PPP contracts.Design/methodology/approachA unique data set of 202 national highway PPP projects from India, comprising 154 toll and 48 annuity projects formed the basis of the study.FindingsThere are significant differences between toll and annuity PPP projects. The former are longer, are implemented in better developed states but are also characterized by higher cost over-runs. The latter are characterized by higher debt–equity ratio.Practical implicationsMitigating revenue risk can significantly enhance the debt capacity of the projects, thereby reducing the overall cost of capital. To make toll roads attractive for bidders, they have to be developed as longer stretches. Toll projects that are immediately ready for development at the time of award would reduce cost overruns of toll projects and sustain the interest of private developers.Originality/valueComparison of toll and annuity PPP road projects has never been done previously. The unique data set used in this study highlights the differences in characterization and performance for both the project types. The study provides evidence support to “intuition” and enables policymakers to choose the right form of PPP to realize their objectives.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference43 articles.

1. Risk allocation in public private partnership (PPP) project: a review on risk factors;International Journal of Sustainable Construction Engineering and Technology,2011

2. PPPs and project overruns: evidence from road projects in India;Journal of Construction Engineering and Management,2014

3. A comparison of construction contract prices for traditionally procured roads and public–private partnerships;Rev Ind Organ,2009

4. Centre for Monitoring Indian Economy (CMIE) (2012), “Infrastructure development index, Annex-3, India”, available at: http://www.unescap.org/our-work/statistics.

5. Empirical evidence for renegotiation of PPP contracts in the road sector;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction,2015

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3