1. Abdulaziz, A.
,
Bubshait, M.
and
Michael, J.
(1998), “Comparison of delay analysis methodologies”,
Journal of Construction Engineering and Management
, Vol. 31 No. 4, p. 124.
2. AbouRizk, S.
,
Knowles, P.
and
Hermann, U.R.
(2001), “Estimating labor production rates for industrial construction activities”,
Journal of Construction Engineering and Management
, Vol. 127 No. 6, pp. 502-511.
3. Ahmed, S.M.
and
Azhar, S.
(2002),
Construction Delays in Florida: An Empirical Study
, Department of Community Affairs, Tallahassee, FL.
4. Alaghbari, W.A.M.
(2005), “Factors affecting construction speed of industrialized building systems in Malaysia”, master’s thesis, University Putra Malaysia, Serdang.
5. Al-Bahar, J.
and
Crandall, K.
(1990), “Systematic risk management approach for construction projects”,
Journal of Construction Engineering and Management
, Vol. 116 No. 3, pp. 533-546.