Development of a client-based risk management methodology for the early design stage of construction processes

Author:

Albogamy Abdullah,Dawood Nashwan

Abstract

Purpose – The risk factors associated with clients have a major impact on the successful delivery of a project from early design to the construction and operation stages. Risk management studies conducted so far have not succeeded in providing an effective risk assessment methodology for clients in analysing and managing the risk factors that cause both project delays and cost overruns. So, the purpose of this paper is to provide a methodology for a client-based risk management model. Design/methodology/approach – A conceptual framework is designed by integrating the findings from a literature review and a construction industry survey in the Kingdom of Saudi Arabia. The framework includes the risk identification, risk analysis and mitigation strategy, which are the key components of the model. The model of the framework is developed by integrating the analytical hierarchy process (AHP) and Monte Carlo simulation (MCS) underpinned within an @Risk program. Findings – A case study is used to demonstrate the proposed methodology; the results found that the model helps to analyse and quantify the impact of risk factors, and also to assist in taking a suitable risk mitigation strategy, particularly at the early design stage in the construction process. Practical implications – The model is applicable to both public and private clients when they need to know the possible project duration in a new construction project, and to take some proactive actions to avoid the adverse effect of client risk factors at the early stage of the project. Originality/value – The model is expected to help in understanding the nature, and analysing the influence, of client risk factors that cause project delays and cost overruns. The development of the methodology for managing the client-based risk in construction processes at the early design stage is the key value of the study.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference44 articles.

1. Abdulaziz, A. , Bubshait, M. and Michael, J. (1998), “Comparison of delay analysis methodologies”, Journal of Construction Engineering and Management , Vol. 31 No. 4, p. 124.

2. AbouRizk, S. , Knowles, P. and Hermann, U.R. (2001), “Estimating labor production rates for industrial construction activities”, Journal of Construction Engineering and Management , Vol. 127 No. 6, pp. 502-511.

3. Ahmed, S.M. and Azhar, S. (2002), Construction Delays in Florida: An Empirical Study , Department of Community Affairs, Tallahassee, FL.

4. Alaghbari, W.A.M. (2005), “Factors affecting construction speed of industrialized building systems in Malaysia”, master’s thesis, University Putra Malaysia, Serdang.

5. Al-Bahar, J. and Crandall, K. (1990), “Systematic risk management approach for construction projects”, Journal of Construction Engineering and Management , Vol. 116 No. 3, pp. 533-546.

Cited by 17 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Management of environmental risks in highway construction projects in Sri Lanka;Construction Innovation;2023-08-10

2. Toward ecological environmental risk for spoil ground group management in mega projects;Engineering, Construction and Architectural Management;2023-05-19

3. Buffer allocation in construction projects: a disruption mitigation approach;Engineering, Construction and Architectural Management;2023-03-30

4. A State-of-the-Art Review of Probabilistic Portfolio Management for Future Stock Markets;Mathematics;2023-02-25

5. Risk Management Practice in Saudi Arabia;Risk Management Practices in Construction;2023

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3