1. Advanced Manufacturing Research, Inc. (1996), “Advanced planning and scheduling systems: just a fad or a breakthrough in manufacturing and supply chain management?”, The Report on Manufacturing, December.
2. Armentano, A. and Ronconi, D. (1999), “Tabu search for total tardiness minimization in flowshop scheduling problems”, Computers & Operations Research, Vol. 26, pp. 219‐35.
3. Armentano, A. and Scrich, C. (2000), “Tabu search for minimizing total tardiness in a job shop”, Int. J. Production Economics, Vol. 63, pp. 131‐40.
4. Badiru, A.B. (1992), Expert Systems Applications in Engineering and Manufacturing, Prentice‐Hall, Englewood Cliffs, NJ.
5. Baker, S. (1988), “Nexpert object: mainstreaming AI applications”, IEEE Expert, Winter, p. 82.