Over the past decade two approaches, just‐in‐time (JIT) and theory of constraints (TOC), for designing and operating production lines have developed, each claiming to be the “correct” way. In addition there are still those who maintain that line balanced (whenever possible) is the optimal method. This study uses simulation to compare each of these approaches for designing and operating production lines under various levels of processing time variability, station downtime, and total system inventory. Not surprisingly, the JIT approach appears to work best when system variability is low. The TOC approach works best when system variability is high. This shows that lines designed using TOC principles perform significantly better than JIT lines when inventory is low, and JIT lines perform significantly better than TOC lines as inventory is added to the system. The traditionally balanced line did not perform best under any of the conditions used in this study.
Subject
Management of Technology and Innovation,Strategy and Management,General Decision Sciences
Reference41 articles.
1. 1.Stevenson, W.J., Production/Operations Management, Richard D. Irwin, Homewood, IL, 1993, pp. 319‐29.
2. 2.Hillier, F.S. and Boling, R.W., “On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times”, Management Science, Vol. 25 No. 8, August 1979, pp. 721‐8.
3. 3.So, K.C., “On the efficiency of unbalancing production lines”, International Journal of Production Research, Vol. 27 No. 4, April 1989, pp. 717‐29.
4. 4.Ohno T., The Toyota Production System: Beyond Large Scale Production, Productivity Press, Cambridge, MA, 1988, p. 21.
5. 5.Goldratt, E., “The unbalanced plant”, 24th American Production and Inventory Control Society International Conference Proceedings, 1981, pp. 195‐9.