Assessing the factors of transactional leadership style for construction projects: a case of Nigerian construction industry

Author:

Olasunkanmi Femi-favour Olabode,Ikediashi Dubem Isaac,Ajiero Ikenna Reginald

Abstract

Purpose The role of construction industry in harnessing human and material resources of a nation cannot be overemphasised; hence, the emergence of the requirement of leadership. This study aims to assess the usage of factors of transactional leadership style (TSLS) by the project managers (PMs) in the Nigeria construction industry. Design/methodology/approach A survey research design approach with questionnaire as an instrument of gathering data was adopted. Out of 1,233 questionnaires distributed, data from 975 received with acceptable feedback were analysed using both descriptive and inferential statistics. Findings This study revealed the following factors under active management by exception as the TSLS factors often employed by PMs in Nigeria. These factors are the three frequently used factors: they are: “always give clear and final instructions to be implemented in the project”; “always observed the progress of the project, assessed risk and took precaution to avoid mistakes in the project”; and “always closely monitor performance for errors needing correction”. This study concludes that it is imperative for PMs in the study area to adopt and incorporate these factors to ensure continuous successful delivery of construction projects. Practical implications Therefore, it is hoped that the findings of this research will help the construction industry managers to address the age-long but unrecognised leadership problem confronting the sector, thereby boosting project delivery. Originality/value The findings establish the appropriateness or otherwise of adoption of factors of transactional leadership, either in part or a whole.

Publisher

Emerald

Subject

General Engineering,Building and Construction

Reference37 articles.

1. The role of construction sector in the quest for inclusive growth in Nigeria. Technical report of ‘the Nigeria economic summit group’ (NESG),2020

2. Assessment of performance of teamwork in construction project delivery in South-Southern Nigeria;Journal of Engineering, Design and Technology,2019

3. Transactional leadership and project success: the moderating role of goal clarity,2016

4. The effects of construction delays on project delivery in Nigeria construction industry;International Journal of Project Management,2002

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3