1. Alarcón, L. and Ashley, D. (1999), “Playing games: evaluating the impact of lean production strategies on project cost and schedule”, Proceedings of the 7th Annual Conference of the International Group for Lean Construction at University of California, Berkeley, CA, pp. 263‐74.
2. Baker, K.R., Powell, S.J. and Pike, D.F. (1990), “Buffered and unbuffered assembly systems with variable processing times”, Journal of Manufacturing and Operations Management, Vol. 3, pp. 200‐23.
3. Burman, M., Gershwin, S.B. and Suyematsu, C. (1998), “Hewlett‐Packard uses operations research to improve the design of a printer production line”, Interfaces, Vol. 28 No. 1, pp. 24‐36.
4. Conway, R., Maxwell, W., McClain, J.O. and Thomas, L.J. (1988), “The role of work‐in‐process inventory in serial production lines”, Operations Research, Vol. 36 No. 3, pp. 229‐41.
5. Dallery, Y. and Gershwin, S.B. (1992), “Manufacturing flow line systems: a review of models and analytical results”, Queuing Systems, Vol. 12, pp. 3‐94.