Abstract
PurposeThis paper explores the quality and flow of facade product information and the capabilities for avoiding the risk of facade fires early in the design process.Design/methodology/approachA qualitative case study using the process tracing method is conducted in two stages. First, a thematic analysis of reports and literature identified two categories for the problems that caused fast fire spread across the Grenfell Tower facade. This enabled classifying the identified problems into four stages of a facade life cycle: product design and manufacturing, procurement, facade design and construction. Second, the capabilities for avoiding the problems were explored by conducting in-depth interviews with 18 experts in nine countries, analyzing design processes and designers' expertise and examining the usability of three digital interfaces in providing required information for designing fire-safe facades.FindingsThe results show fundamental flaws in the quality of facade product information and usability of digital interfaces concerning fire safety. These flaws, fragmented design processes and overreliance on other specialists increase the risk of design defects that cause fast fire spread across facades.Practical implicationsThe findings have implications for standardization of building product information, digitalization in industrialized construction and facade design management.Originality/valueThis research adds to the body of knowledge on sustainability in the built environment. It is the first study to highlight the fundamental problem of facade product information, which requires urgent attention in the rapid transition toward digital and industrialized construction.
Subject
Urban Studies,Building and Construction,Renewable Energy, Sustainability and the Environment,Civil and Structural Engineering,Architecture,Cultural Studies
Reference73 articles.
1. A BIM-based approach for DfMA in building construction: framework and first results on an Italian case study;Architectural Engineering and Design Management,2020
2. Industrialization of construction: implications on standards, business models and project orientation;Organization, Technology and Management in Construction,2020
3. Anketell-Jones, D. (2019), “Grenfell tower public inquiry-witness statement”, available at: https://assets.grenfelltowerinquiry.org.uk/HAR00010513_2019.03.19 Daniel Anketell-Jones supplementary statement %28Harley Facades%29.pdf (accessed 28 November 2021).
4. Australian Building Codes Board (2020), “Fire performance of external walls and cladding”, available at: https://www.abcb.gov.au/Resources/Publications/Education-Training/Fire-performance-of-external-walls-and-cladding (accessed 28 November 2021).
5. Enabling the diffusion of sustainable product innovations in BIM library platforms;Journal of Innovation Management,2019