Predicting implementation cost contingencies for residential construction projects in flood-prone areas

Author:

Van Sang Quang,Le-Hoai Long,Dang Chau Ngoc

Abstract

Purpose The purpose of this paper is to predict implementation cost contingencies for residential construction projects in flood-prone areas, where floods with storms frequently cause serious damage and problems for people. Design/methodology/approach Expert interviews are conducted to identify the study variables. Based on bills of quantities and project documents, historical data on residential construction projects in flood-prone areas are collected. Pearson correlation analysis is first used to check the correlations among the study variables. To overcome multicollinearity, principal component analysis is used. Then, stepwise multiple regression analysis is used to develop the cost prediction model. Finally, non-parametric bootstrap method is used to develop range estimation of the implementation cost. Findings A list of project-related variables, which could significantly affect implementation costs of residential construction projects in flood-prone areas, is identified. A model, which is developed based on an integration of principle component analysis and regression analysis, is robust. Regarding range estimation, 10, 50 and 90 percent cost estimates, which could provide information about the uncertainty levels in the estimates, are established. Furthermore, implementation cost contingencies which could show information about the variability in the estimates are determined for example case projects. Such information could be critical to cost-related management of residential construction projects in flood-prone areas. Originality/value This study attempts to predict implementation cost contingencies for residential construction projects in flood-prone areas using non-parametric bootstrap method. Such contingencies could be useful for project cost budgeting and/or effective cost management.

Publisher

Emerald

Subject

Strategy and Management,Business and International Management

Reference114 articles.

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Impact of aleatoric, stochastic and epistemic uncertainties on project cost contingency reserves;International Journal of Production Economics;2022-11

2. Defining integration capability dimensions and creating a corresponding self-assessment model for inter-organizational projects;International Journal of Managing Projects in Business;2022-05-31

3. Research on flood level forecasting in tidal river based on mixture regressive model;2021 2nd International Conference on Big Data & Artificial Intelligence & Software Engineering (ICBASE);2021-09

4. Proposing a strategy map for coastal urban project success using the balanced scorecard method;Engineering, Construction and Architectural Management;2020-05-29

5. Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects;KSCE Journal of Civil Engineering;2020-03-09

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3