Initiatives that enable Singapore contractors to improve construction productivity

Author:

Ofori George,Zhang ZheORCID,Ling Florence Y.Y.ORCID

Abstract

PurposeThis study examines the initiatives that would enable contractors in Singapore to improve the level of construction productivity.Design/methodology/approachA two-pronged research method was employed: questionnaire survey with contractors (109 responses received) and in-depth interviews with 12 subject matter experts. The questionnaire covered questions such as the current and future improvement measures.FindingsThe results show that the top three motives for achieving high productivity (increase profitability, on time delivery and enhance corporate competitiveness) are underpinned by profit maximization. Factor analysis revealed several categories of productivity improvement strategies. Among these, only site operations category is under the control of contractors. Other important categories include government's initiatives and design factors.Research limitations/implicationsWhile contractors are the producers of built products, their productivity is very much dependent on other factors and other parties. The long-standing exhortation to contractors to improve productivity is necessary but not a sufficient condition to improve it.Practical implicationsRecommendations are provided for the government, designers, contractors and other stakeholders on what can be done to improve productivity.Originality/valueThis research adds to knowledge by showing that contractors' top motives for high productivity relate to self-seeking behavior to maximize profit. Prior to this study, productivity improvement is considered the responsibility of contractors. This study shows that two other stakeholders also hold the key to productivity improvement – government and designers. Government controls the supply of foreign labor, has the capacity to offer incentives and has the muscle to enact regulations to improve productivity. Consultants' upstream designs must be buildable.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference58 articles.

1. An exploratory study on the impact of mobile ICT on productivity in construction projects;Built Environment Project and Asset Management,2018

2. Allen, M. (2017), “Factor analysis: varimax rotation”, in The Sage Encyclopedia of Communication Research Methods, available at: https://methods.sagepub.com/reference/the-sage-encyclopedia-of-communication-research-methods/i5417.xml (accessed 1 June 2021).

3. Learning to see work flow: an application of lean concepts to precast concrete fabrication;Engineering, Construction and Architectural Management,2003

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3