Abstract
PurposeThis study examines the initiatives that would enable contractors in Singapore to improve the level of construction productivity.Design/methodology/approachA two-pronged research method was employed: questionnaire survey with contractors (109 responses received) and in-depth interviews with 12 subject matter experts. The questionnaire covered questions such as the current and future improvement measures.FindingsThe results show that the top three motives for achieving high productivity (increase profitability, on time delivery and enhance corporate competitiveness) are underpinned by profit maximization. Factor analysis revealed several categories of productivity improvement strategies. Among these, only site operations category is under the control of contractors. Other important categories include government's initiatives and design factors.Research limitations/implicationsWhile contractors are the producers of built products, their productivity is very much dependent on other factors and other parties. The long-standing exhortation to contractors to improve productivity is necessary but not a sufficient condition to improve it.Practical implicationsRecommendations are provided for the government, designers, contractors and other stakeholders on what can be done to improve productivity.Originality/valueThis research adds to knowledge by showing that contractors' top motives for high productivity relate to self-seeking behavior to maximize profit. Prior to this study, productivity improvement is considered the responsibility of contractors. This study shows that two other stakeholders also hold the key to productivity improvement – government and designers. Government controls the supply of foreign labor, has the capacity to offer incentives and has the muscle to enact regulations to improve productivity. Consultants' upstream designs must be buildable.
Subject
Management Science and Operations Research,Civil and Structural Engineering
Reference58 articles.
1. An exploratory study on the impact of mobile ICT on productivity in construction projects;Built Environment Project and Asset Management,2018
2. Allen, M. (2017), “Factor analysis: varimax rotation”, in The Sage Encyclopedia of Communication Research Methods, available at: https://methods.sagepub.com/reference/the-sage-encyclopedia-of-communication-research-methods/i5417.xml (accessed 1 June 2021).
3. Learning to see work flow: an application of lean concepts to precast concrete fabrication;Engineering, Construction and Architectural Management,2003
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献