Author:
Xin Bo,Li Yuan,Yu Jianfeng,Zhang Jie
Abstract
Purpose
– The purpose of this paper is to investigate the multi-skilled workers assignment problem in complex assembly systems such as aircraft assembly lines. An adaptive binary particle swarm optimization (A-BPSO) algorithm is proposed, which is used to balance the workload of both assembly stations and processes and to minimize the human cost.
Design/methodology/approach
– Firstly, a cycle time model considering the cooperation of multi-skilled workers is constructed. This model provides a quantitative description of the relationship between the cycle time and multi-skilled workers by means of revising the standard learning curve with the “Partition-And-Accumulate” method. Then, to improve the accuracy and stability of the current heuristic algorithms, an A-BPSO algorithm that suits for the discrete optimization problems is proposed to assign multi-skilled workers to assembly stations and processes based on modified sigmoid limiting function.
Findings
– The proposed method has been successfully applied to a practical case, and the result justifies its advantage as well as adaptability to both theory and engineering application.
Originality/value
– A novel cycle time model considering cooperation of multi-skilled workers is constructed so that the calculation results of cycle time are more accurate and closer to reality. An A-BPSO algorithm is proposed to improve the stability and convergence in dealing with the problems with higher dimensional search space. This research can be used by the project managers and dispatchers on assembly field.
Subject
Industrial and Manufacturing Engineering,Control and Systems Engineering
Reference46 articles.
1. Anzanello, M.J.
and
Fogliatto, F.S.
(2007), “Learning curve modelling of work assignment in mass customized assembly lines”,
International Journal of Production Research
, Vol. 45 No. 13, pp. 2919-2938.
2. Argote, L.
(2013), “Organizational learning curves: an overview”, in Chapter 1,
Organizational Learning
, Springer, New York.
3. Aryanezhad, M.B.
,
Deljoo, V.
and
Mirzapour Al-e-Hashem, S.M.J.
(2009), “Dynamic cell formation and the worker assignment problem: a new model”,
The International Journal of Advanced Manufacturing Technology
, Vol. 41 Nos 3/4, pp. 329-342.
4. Askin, R.G.
and
Huang, Y.
(2001), “Forming effective worker teams for cellular manufacturing”,
International Journal of Production Research
, Vol. 39 No. 11, pp. 2431-2451.
5. Azadeh, A.
,
Asadzadeh, S.M.
and
Tadayoun, S.
(2014), “Optimization of operator allocation in a large multi product assembly shop through unique integration of simulation and genetic algorithm”,
The International Journal of Advanced Manufacturing Technology
, Vol. 76 Nos 1/4, pp. 471-486.
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献