Author:
Wijesinghe Prashan Bandara,Illankoon Prasanna
Abstract
Purpose
The purpose of this study was to improve the overall equipment effectiveness (OEE) of the production process of the shredder operation of ABC company, an industrial waste management company which supplies pre-processed industrial waste as alternative fuel to a cement plant.
Design/methodology/approach
This case study investigated all possible availability and performance losses that caused the shredder system’s OEE and various problem-solving techniques, such as root cause analysis and Pareto analysis, were used to find the root cause of the reduced OEE.
Findings
After analysing this case study, three significant loss factors were identified from all the availability and performance losses, which caused the shredder system’s OEE losses. Practical solutions were found for the effect of those loss factors to improve the machine’s OEE and productivity.
Research limitations/implications
This case study has been concentrated on only analysing of losses and improvement of OEE in the production process and not about cost analysis between loss and improvements.
Originality/value
This paper shows how to improve the OEE of a production process through various problem-solving techniques by identifying its losses and how to achieve the best solutions for those losses in a practical manner.
Subject
Organizational Behavior and Human Resource Management,Management Science and Operations Research,Strategy and Management
Reference21 articles.
1. Andersson, J.E. (2010), “Efficiency manager development of an OEE measurement system”, MSc Thesis, pp. 3-6, available at: https://scholar.google.com/scholar?q=Andersson,+J.E.+(2010).+Efficiency+Manager+Development+of+an+OEE+Measurement+System.+MSc+Thesis.&hl=en&as_sdt=0&as_vis=1&oi=scholart (accessed 1 July 2021).
2. Factors affecting successful implementation of total productive maintenance: a UK manufacturing case study perspective;Journal of Quality in Maintenance Engineering,1999
3. The use of SMED to eliminate small stops in a manufacturing firm;Journal of Manufacturing Technology Management,2013
4. Proposal for OEE (overall equipment effectiveness) indicator deployment in a beverage plant;Brazilian Journal of Operations and Production Management,2012
5. Maintenance performance analysis: a practical approach;Journal of Quality in Maintenance Engineering,1995
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献